Site Inspection of Ongoing Construction

The Camiling RIS conducted a Site Inspection on the ongoing construction of Thresher Crossing to ensure that the structure will not impede the flow of irrigation water to the service area. Permit to construct the crossing was released on January 28, 2022. 
#TuloyAngDaloyNIA